Präqualifikation / Eignungsnachweise
All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections.
EnBW Energie Baden-Württemberg AG · Karlsruhe · Baden-Württemberg
Neue Ausschreibungen in „Energie & Umwelt" — jede Woche per Email
Kostenlos · 1 Email pro Woche · Ein-Klick-Abmeldung · DSGVO-konform
Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition t
Die vollständige Beschreibung ist für registrierte Nutzer verfügbar.
Branche: Energie & Umwelt
Ausschreibung für periodische Unterwasserinspektionen von Offshore-Windparks in Ost- und Nordsee.
Hinweis nach EU AI Act Art. 50: Diese Kurzanalyse wurde automatisiert von einem KI-Modell (Google Gemini) erstellt und ist ausschließlich ein Hilfsmittel zur schnellen Orientierung. Sie ersetzt keine Prüfung der Original-Vergabeunterlagen und ist keine Eignungs- oder Rechtsberatung. Die verbindlichen Angaben entnehmen Sie bitte der Bekanntmachung auf oeffentlichevergabe.de. Details zu unserer KI-Nutzung: KI-Transparenz.
Wonach der Auftraggeber das wirtschaftlichste Angebot ermittelt.
Total Cost of Ownership
Suitability of proposed methods and tooling to perform scope of work: - General Visual Inspection (GVI) - Close Visual Inspection (CVI) - Ultrasonic Wall Thickness Measurement (UT) - Marine Growth (MG) Measurement - Cathodic Protection (CP) Potential Measurement - Reference-based Measurement of Cable Protection System (CPS) and Scour - MG Cleaning to CSWIP Grade SA 2½
Contract deviations
Suitability of proposed ROV(s): - Appropriate ROV type/classification - ROV weight (kg)/dimensions (m) - ROV thruster speed suitable for currents - ROV justified and demonstrates experience in executing similar work - ROV capable of performing in a variety of environmental conditions - Operational limits are reasonable (e.g. for L&R) - Max ROV payload suitable for carrying required tooling
Review of provided project management qualifications: - Document management system - Monitoring of progress during mobilisation and execution - Post-execution quality and reporting - Strong evidence of experience through submission of supporting documentation (e.g. RAMS or inspection reports) - Suitable management system in place for provision of any critical tooling, equipment and materials - Robust back-office team to support offshore delivery team - Where subcontracted, clear selection process for subcontractors - Where subcontracted, clear management process for subcontractors
Capabilities beyond scheduled works: - Subject Matter Expert (e.g. CP) - Continuous improvement of inspection execution - Additional inspection methods (e.g. 3D anode scanning) - Custom inspection solutions to address unexpected requirements
Review of provided personnel qualifications: - Organigrams, CVs and competency matrices for key roles - Verification of personnel information (e.g. required qualifications and training records)
Total Cost of Ownership
Suitability of proposed methods and tooling to perform scope of work: - General Visual Inspection (GVI) - Close Visual Inspection (CVI) - Ultrasonic Wall Thickness Measurement (UT) - Marine Growth (MG) Measurement - Cathodic Protection (CP) Potential Measurement - Reference-based Measurement of Cable Protection System (CPS) and Scour - MG Cleaning to CSWIP Grade SA 2½
Contract deviations
Suitability of proposed ROV(s): - Appropriate ROV type/classification - ROV weight (kg)/dimensions (m) - ROV thruster speed suitable for currents - ROV justified and demonstrates experience in executing similar work - ROV capable of performing in a variety of environmental conditions - Operational limits are reasonable (e.g. for L&R) - Max ROV payload suitable for carrying required tooling
Review of provided project management qualifications: - Document management system - Monitoring of progress during mobilisation and execution - Post-execution quality and reporting - Strong evidence of experience through submission of supporting documentation (e.g. RAMS or inspection reports) - Suitable management system in place for provision of any critical tooling, equipment and materials - Robust back-office team to support offshore delivery team - Where subcontracted, clear selection process for subcontractors - Where subcontracted, clear management process for subcontractors
Capabilities beyond scheduled works: - Subject Matter Expert (e.g. CP) - Continuous improvement of inspection execution - Additional inspection methods (e.g. 3D anode scanning) - Custom inspection solutions to address unexpected requirements
Review of provided personnel qualifications: - Organigrams, CVs and competency matrices for key roles - Verification of personnel information (e.g. required qualifications and training records)
Quelle: Bekanntmachung (eForms) — Gewichtung wie vom Auftraggeber veröffentlicht.
Die folgenden Textstellen stammen wortwörtlich aus der Bekanntmachung der Vergabestelle. Wir stellen sie strukturiert dar, ohne sie zu paraphrasieren oder zu interpretieren. Die Zuordnung zu Kategorien erfolgt KI-gestützt — die Zitate selbst sind unverändert und via Substring-Match verifiziert (KI-Transparenz nach Art. 50 EU AI Act).
All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections.
Vollständige Historie dieses Vergabeverfahrens — alle Phasen und Veröffentlichungen.
Angebote werden eingeholt
1 Veröffentlichung
Auftrag wurde zugeschlagen
2 Veröffentlichungen
Basierend auf 64 vergleichbaren Vergabeergebnissen:
Statistische Auswertung öffentlicher Zuschlagswerte. Keine Preisempfehlung.
📬
Erhalten Sie automatisch passende Aufträge — bevor Ihre Wettbewerber davon erfahren.
💡 Mehr als wöchentlich? Watchlist ab 9 €/Mo: täglich + Frist-Reminder + Zuschlag-Info →
Personalisiertes Suchprofil einrichten → · Für Einkaufsabteilungen: Rechnung per Überweisung →