RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption
Trianel Flexibilitätsprojekte GmbH & Co. KG · Aachen · Nordrhein-Westfalen · Öffentliches Unternehmen
Angebote bis 24.08.2026, 12:00 Uhr (noch 29 Tage)
Beschreibung
Founded in 1999, Trianel GmbH ("Trianel") is a joint venture of independent municipal utilities based in Aachen. As a Europe-wide municipal utility cooperation, Trianel taps the potential of liberalized energy markets by bundling complementary interests in the municipal environment with the aim of strengthening municipal utilities in their competitiveness and thus their independence. Trianel's shareholders are more than 50 municipal utilities from Germany, Austria, Switzerland and the Netherlands, which together supply around 6 million people with electricity and gas. More than 100 municipal utilities are linked to Trianel via subsidiaries and associated companies as well as partnership agreements. The Trianel Group currently has around 15 subsidiaries and associated companies. The construction services described in this tender are a joint procurement of "Stadtwerke Mosbach GmbH" (municipal utilities) and Trianel Flexibilitätsprojekte GmbH & Co. KG ("TFP"), a subsidiary company of Trianel GmbH. Scope of the project is the engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption in Mosbach (Baden-Württemberg). For this purpose, RegioSpeicher Mosbach GmbH & Co. KG, a project company will be established.
KI-Eignungsanalyse
KI-generiertBranche: Energie & Umwelt
Das Wichtigste auf einen Blick
- Auftragsgegenstand ist die schlüsselfertige Errichtung einer 10 MW Lithium-Ionen-Batteriespeicheranlage.
- Es handelt sich um ein EPC-Projekt (Engineering, Procurement, Construction).
- Der Erfüllungsort ist Mosbach (Baden-Württemberg).
- Es wird ein Verhandlungsverfahren mit Teilnahmewettbewerb angewendet.
- Umfassende Erfahrung im Bau von Energiespeichern ist für die Eignung voraussichtlich entscheidend.
Die Ausschreibung betrifft das Engineering, die Beschaffung und den Bau (EPC) einer Lithium-Ionen-Batteriespeicheranlage mit 10 MW Leistung in Mosbach.
Hinweis nach EU AI Act Art. 50: automatisiert erstellt (Google Gemini) — ersetzt keine Prüfung der Original-Vergabeunterlagen. Mehr ▾
Diese Kurzanalyse ist ausschließlich ein Hilfsmittel zur schnellen Orientierung und keine Eignungs- oder Rechtsberatung. Die verbindlichen Angaben entnehmen Sie bitte der Original-Bekanntmachung (oeffentlichevergabe.de). Details zu unserer KI-Nutzung: KI-Transparenz.
🎯 Persönlicher Treffer-Check
Wie viele Energie & Umwelt-Ausschreibungen in Nordrhein-Westfalen passen zu Ihrem Unternehmen?
30 Sekunden, keine Anmeldung — wir zeigen Ihnen live, wie viele relevante Vergaben es zuletzt gab.
Passende Ausschreibungen in „Energie & Umwelt" automatisch erhalten
14 Tage voller Zugang gratis — tägliche Alerts + KI-Eignungsanalyse · keine Kreditkarte · danach kostenfrei weiter
Weitere Pflichtangaben aus der Bekanntmachung
3–5 Bewerber zugelassen · sukzessive Reduktion möglich
Anforderungen an Bieter (Eignung)
Was Sie zur Teilnahme nachweisen müssen — wie vom Auftraggeber gefordert.
Befähigung zur Berufsausübung
-
Eintragung Handelsregister
The documents which the applicant must enclose with its application to participate are listed below. For this purpose, the applicant must use the forms (application documents) provided by the contracting authorities. Submitted supporting documents must still be valid; insofar as requirements are made regarding up-to dateness, the date refers to the date of publication of this notice. With their request to participate, applicants must submit the following documents: PL1. Self-declaration regarding exclusion criteria (Sec. 123, 124 GWB). A form is included in the application documents. PL2. Self-declaration on the company with information on the company name, legal form, registered office, object, management of the company, company structure (e.g. parent companies, group affiliation, branches - organization chart), with presentation of the company and capital relationships of the applicant and, if applicable, the responsible branch office and query on SME status. A form is included in the application documents. PL3. Self-declaration on the 5th EU package of sanctions ("RUS sanctions"). A form is included in the application documents. In the case of applicant consortia, the evidence must be provided by each member of the applicant consortium. A loan of qualifications in accordance with Section 47 SektVO for the purpose of demonstrating PL is not permitted. If an applicant is unable to provide any required evidence for a valid reason, it may demonstrate its ability to perform by submitting other appropriate evidence. The contracting authorities reserve the right to request further self-declarations and certificates for applicants selected at the end of the call for competition and any subcontractors upon separate request with the submission of the offer.
Wirtschaftliche & finanzielle Leistungsfähigkeit
-
Durchschnittlicher Jahresumsatz
WL1. Self-declaration concerning the economic and financial capabilities of the applicant, in particular statement of total turnover of the applicant of the last 3 financial years. The form in the application documents shall be used. WL2. Selfdeclaration of the annual turnover of the applicant for services comparable with the services put out in this tender (the decisive factor for comparability is turnover for engineering, procurement and construction (EPC) with regard to Battery Energy Storage System projects) in the last 3 financial years. In the case of applicant consortia, the evidence can be provided for the applicant consortium in total. In the case of a loan of qualifications pursuant to Section 47 SektVO, particularly where subcontractors are involved, the relevant supporting documents must be submitted for the relevant companies. If an applicant is unable to provide any required evidence for a valid reason, it may demonstrate its ability to perform by submitting other appropriate evidence. The contracting authorities reserve the right to request further self-declarations and certificates for applicants selected at the end of the call for competition and any subcontractors upon separate request with the submission of the offer. The contracting authorities reserve the right to obtain financial information on the applicant.
Technische & berufliche Leistungsfähigkeit
-
Qualitätsmanagement
Only the references (technical and professional ability) are decisive for the assessment of suitability. The information and evidence listed under TL are used to assess the references. A maximum total of 1,000 points can be achieved here. The proofs PL and WL are not evaluated qualitatively. The evaluation of technical and professional ability is carried out in a relative comparison of the applicants with each other on the basis of the following scale/grade levels. The maximum number of points achievable is multiplied by the weighting factor (percentage) achieved in each case: - 100% = very good: Applicant meets the requirements with regard to the suitability criterion to the very highest degree, - 80% = good: Applicant meets the requirements of the suitability criterion to the highest degree, - 60% = fully satisfactory: applicant meets the requirements of the suitability criterion to a high degree, - 40% = satisfactory: applicant satisfactorily fulfills the requirements with regard to the suitability criterion, - 20% = sufficient: the applicant meets the requirements of the suitability criterion to a just sufficient degree. In the range between 0% and 100%, intermediate grade levels can be formed (10%, 30%, 50%, 70%, 90%) to take into account a tendency towards the higher grade level in each case. An evaluation of a suitability criterion (technical and professional ability) with 20% or less would correspond to a complete non-fulfillment of the respective suitability criterion, which would result in the exclusion of the participation application (knock-out criterion). These are suitability criteria, not award criteria. If several bidders achieve the same total score and the number of bidders exceeds the planned number of bidders to be invited to negotiate, the contracting authorities reserve the option to draw lots for the negotiation procedure among the remaining bidders with equal scores.
-
Kontrolle durch Qualitätsprüfstellen
Valid certification for a quality management system (e.g., in accordance with DIN EN ISO 9001) or an equivalent system. The scope of the certificate must cover the services specified in this request for proposals (e.g., EPC-contractor, system integration, manufacturing). The certificate must be issued by an accredited certification body and must still be valid as of the application deadline.
-
Referenzen (vergleichbare Bauleistungen)
TL. Experience in the execution of comparable construction services, evidenced by reference projects (realized similar projects in connection with engineering, procurement and construction (EPC) with regard to Battery Energy Storage Systems in the last maximum of 5 years (self-declarations)). Similar means a reference project with a minimum capacity of 5 MWh. The reference projects must have been carried out or completed within the last 5 years. In the case of applicant consortia, corresponding information can be submitted for the applicant consortium as a whole. In the case of a loan of qualifications pursuant to Section 47 SektVO, particularly where subcontractors are involved, the relevant supporting documents must be submitted for the relevant companies. The references are to be submitted in accordance with the form from the application documents with the information specified therein, in particular including project start and actual operating period. If possible, please submit no more than 5 references and sort them according to their relevance and comparability with the subject of the tender. In individual cases, the contracting authorities may request the submission of reference certificates from the reference clients. Minimum level of standard: The bidder must have realized at least two similar reference projects of comparable size in the European Union or UK (successful commissioning of the relevant system).
Quelle: Bekanntmachung (eForms). Maßgeblich sind die vollständigen Vergabeunterlagen.
Erfüllen Sie diese Anforderungen?
Diese Ausschreibung verlangt Nachweise zu Befähigung zur Berufsausübung, Wirtschaftliche & finanzielle Leistungsfähigkeit, Technische & berufliche Leistungsfähigkeit. Mit einem kostenlosen Firmenprofil gleichen wir die veröffentlichten Anforderungen automatisch mit Ihrem Profil ab — bei jeder Ausschreibung mit strukturierten Eignungskriterien. 14 Tage voller Zugang, keine Kreditkarte.
Mit der Anmeldung akzeptieren Sie unsere AGB und bestätigen, die Datenschutzerklärung zur Kenntnis genommen zu haben. AusschreibungsRadar richtet sich ausschließlich an Unternehmer im Sinne von § 14 BGB.
Vergabe- & Vertragsbedingungen
Wichtige Bedingungen für Angebot und Ausführung — wie vom Auftraggeber bekannt gemacht.
-
Nachforderung fehlender Unterlagen möglich
Der Auftraggeber darf fehlende, unvollständige oder fehlerhafte Unterlagen nachfordern (§ 56 VgV).
- Elektronische Rechnung (eRechnung) zugelassen
-
Besondere Bedingungen für die Auftragsausführung
Der Auftrag ist an zusätzliche Ausführungsbedingungen geknüpft (§ 128 GWB) — Details in den Vergabeunterlagen.
Hinweise zur Nachprüfung & Rügepflicht
Application of public procurement law and jurisdiction of the Public Procurement Tribunal: The contracting authorities assume that the relevant EU thresholds for the applicability of sector-specific public procurement law (cf Directive on procurement by entities operating in the water, energy, transport and postal services, No. 2014/25/EU) have not been reached in this tender. For this reason, the following explanations and the reference to the public procurement tribunal are provided purely as a precautionary measure. The time-limit for appeal is regulated under Sec. 160 para. 3 GWB. The application is inadmissible if: 1) The applicant became aware of the alleged violation of provisions governing the awarding of public contracts before submitting the appeal and did not object to the contracting entity within 10 calendar days; the deadline stipulated in Sec. 134 para. 2 remains unaffected; 2) Violations of provisions governing the awarding of public contracts which become apparent from the tender notice are not notified to the contracting entity by the end of the period specified in the notice for the submission of a tender or application; 3) violations of provisions governing the awarding of public contracts which only become apparent from the award documents are not notified to the contracting entity by the end of the period specified in the notice for the submission of a tender or application; 4) More than 15 calendar days have elapsed from the receipt of notification from the contracting entity that it is unwilling to redress the complaint. The above sentence does not apply to an application for a declaration of invalidity of the contract pursuant to Sec. 135 para. 1 no. 2 GWB. Sec. 134 para. 1 sentence 2 GWB remains unaffected.
Quelle: Bekanntmachung (eForms). Maßgeblich sind die vollständigen Vergabeunterlagen.
Verfahrensverlauf
📅 .icsVollständige Historie dieses Vergabeverfahrens — alle Phasen und Veröffentlichungen.
-
Ausschreibung Sie sind hier noch 29 Tage
Angebote werden eingeholt
1 Veröffentlichung
- Frist 24.08.2026 Original-Veröffentlichung · in TED EU + oev aktuell
Watchlist buchen →Frist nicht verpassen?
Frist-Reminder T-7/T-3/T-1 per Email ab 9 €/Mo. Plus Merken & Pipeline für weitere Ausschreibungen.
-
Wertung
nach Ablauf der Angebotsfrist
-
Vergabeergebnis
Vergabeergebnis noch nicht veröffentlicht
Preiseinschätzung
Basierend auf 709 vergleichbaren Vergabeergebnissen:
Statistische Auswertung öffentlicher Zuschlagswerte. Keine Preisempfehlung.
Ähnliche Ausschreibungen
📬
Passende Ausschreibungen automatisch finden
14 Tage volle KI-Analyse + tägliche Alerts gratis testen — keine Kreditkarte, danach kostenfrei weiter.
💡 Mehr als wöchentlich? Watchlist ab 9 €/Mo: täglich + Frist-Reminder + Zuschlag-Info →
Personalisiertes Suchprofil einrichten → · Für Einkaufsabteilungen: Rechnung per Überweisung →