The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, at the Greifswalder Bodden, Mecklenburg-Western Pomerania, Germany. For the landings, 3 Horizontal Directional Drillings (HDD) with cable ducts are planned. This Scope is Lot 1. ---- The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is located in Vierow at the Greifswald Bodden (Mecklenburg-Western Pomerania, Germany). For the landings, 3 Hori-zontal Directional Drillings (HDD) with cable ducts are planned. This Scope is Lot 2. ---- The landfall for the planned BEI HVDC cable system, is located at Sose Odde on the Baltic Sea Island of Bornholm (Denmark). For the landings, 3 Horizontal Directional Drillings (HDD) with ca-ble ducts are planned. This Scope is Lot 3. ----- Lot 4 to 6 are Combination Lots of Lot 1 to Lot 3. ---- For all lots, the landfall structure will be used to accommodate power cables. The subject of the contract is the full scope required for the planning and execution of the complete landing structure. Delivery and installation of the power cables are not part of the contract per lot. As part of the engineering, detailed design, work method statements and related documents as well as the scope- and process-specific work and its conceptualization are to be implemented. Documentation of production, quality assurance and as-built planning are further components of the engineering. The execution work scope includes the setup of the construction site both on land and sea and the preparation of the construction site by means of access roads and construction roads. This also includes clearing the construction site. Environmental avoidance, mitigation and protection measures must be carried out in accordance with permit requirements. The delivery and pre-assembly of ducts, the production of auxiliary structures and temporary construction aids on land and water, as well as the drilling of boreholes for the installation of cable ducts (constitutin
Vollständige Beschreibung (2.409 Zeichen)
Die vollständige Beschreibung ist für registrierte Nutzer verfügbar.
KI-Eignungsanalyse
KI-generiertBranche: Bauwesen & Infrastruktur
Ausschreibung für die Planung und Ausführung von Horizontalbohrungen (HDD) für die Landung von Hochspannungs-Gleichstrom-Seekabeln (HVDC) für die Projekte Ostwind 4 und Bornholm Energy Island.
Hinweis: Diese Kurzanalyse wurde automatisiert von einem KI-Modell erstellt und ist ausschließlich ein Hilfsmittel zur schnellen Orientierung. Sie ersetzt keine Prüfung der Original-Vergabeunterlagen und ist keine Eignungs- oder Rechtsberatung. Die verbindlichen Angaben entnehmen Sie bitte der Bekanntmachung auf oeffentlichevergabe.de.
Preiseinschätzung
Basierend auf 131 vergleichbaren Vergabeergebnissen:
Statistische Auswertung öffentlicher Zuschlagswerte. Keine Preisempfehlung.
Ähnliche Ausschreibungen
📬
Ähnliche Ausschreibungen per E-Mail
Erhalten Sie automatisch passende Aufträge — bevor Ihre Wettbewerber davon erfahren.
Personalisiertes Suchprofil einrichten → · Für Einkaufsabteilungen: Rechnung per Überweisung →