EN-B1: Technical and professional ability (Mit dem Teilnahmeantrag; Mittels Eigenerklärung): 1. The technical assessment is only based on reference projects with a minimum commission value of 100.000 EUR (net).
2. At least 1 reference project in the technical field covering variable Renewable Energy On-Grid Regulation and Market Development activities on:
(1.) vRE generation grid connection and procurement framework design
(2.) Transaction advisory, PPA (Power Purchase Agreement) structuring, and negotiation,
Ganze Anforderung lesenWeniger anzeigen
(3.) Enabling regional and cross-border electricity trading,
(4.) Designing regulatory frameworks for vRE grid integration,
(5.) Tariff design for vRE grid-related tariffs and pricing mechanisms
in the last 36 months ( (deadline: date of
publication of invitation to tender).
- Activities can be demonstrated across one or more reference projects.
- Each relevant activity must have a contractual value of at least EUR 100,000.
- Bidders must specify which activities from points (1) to (5) each project covers.
and at least 1 reference project in the technical field covering variable Renewable Energy Off-Grid Regulation and Market Development activities on:
(6.) Design of mini-grid regulations,
(7.) Mini-grid licensing and concessioning,
(8.) Mini-grid tariff setting and financial models,
(9.) Mini-grid and standalone systems competitive procurement frameworks (e.g., public tendering for electrification via mini-grids),
(10.) Contractual and operational frameworks for standalone systems
in the last 36 months (deadline: date of
publication of invitation to tender).
- Activities can be demonstrated across one or more reference projects.
- Each relevant activity must have a contractual value of at least EUR 100,000.
- Bidders must specify which activities from points (6) to (10) each project covers.