AusschreibungsRadar — Verfahrensauszug
Deutschland – Bauarbeiten für Rohrleitungen, Fernmelde- und Stromleitungen, für Autobahnen, Straßen, Flugplätze und Eisenbahnen; Nivellierungsarbeiten – HDD Landfall - Ostwind 4 and Bornholm Energy Island
Stammdaten
- Auftraggeber
- 50Hertz Transmission GmbH — 50Hertz Offshore GmbH — 50Hertz Connectors GmbH
- Veröffentlicht
- 11.06.2025
- Notice-Typ
- Ausschreibung
- Verfahrensart
- Verhandlungsverfahren mit Teilnahmewettbewerb
- CPV-Code
- 45230000 — Bauleistungen
- Branche
- Bauwesen & Infrastruktur
Beschreibung
The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, at the Greifswalder Bodden, Mecklenburg-Western Pomerania, Germany. For the landings, 3 Horizontal Directional Drillings (HDD) with cable ducts are planned. This Scope is Lot 1. — The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is located in Vierow at the Greifswald Bodden (Mecklenburg-Western Pomerania, Germany). For the landings, 3 Hori-zontal Directional Drillings (HDD) with cable ducts are planned. This Scope is Lot 2. — The landfall for the planned BEI HVDC cable system, is located at Sose Odde on the Baltic Sea Island of Bornholm (Denmark). For the landings, 3 Horizontal Directional Drillings (HDD) with ca-ble ducts are planned. This Scope is Lot 3. — The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, at the Greifswalder Bodden, Mecklenburg-Western Pomerania, Germany. For the landings, 3 Horizontal Directional Drillings (HDD) with cable ducts are planned. The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is located in Vierow at the Greifswald Bodden (Mecklenburg-Western Pomerania, Germany). For the landings, 3 Hori-zontal Directional Drillings (HDD) with cable ducts are planned. — The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is located in Vierow at the Greifswald Bodden (Mecklenburg-Western Pomerania, Germany). For the landings, 3 Hori-zontal Directional Drillings (HDD) with cable ducts are planned. The landfall for the planned BEI HVDC cable system, is located at Sose Odde on the Baltic Sea Island of Bornholm (Denmark). For the landings, 3 Horizontal Directional Drillings (HDD) with ca-ble ducts are planned. This Scope is Lot 3. — The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, at the Greifswalder Bodden, Mecklenburg-Western Pomerania, Germany. For the landings, 3 Horizontal Directional Drillings (HDD) with cable ducts are planned. The landfall for the planned Bornholm Energy Island (BEI) HVDC cable system is located in Vierow at the Greifswald Bodden (Mecklenburg-Western Pomerania, Germany). For the landings, 3 Hori-zontal Directional Drillings (HDD) with cable ducts are planned. The landfall for the planned BEI HVDC cable system, is located at Sose Odde on the Baltic Sea Island of Bornholm (Denmark). For the landings, 3 Horizontal Directional Drillings (HDD) with ca-ble ducts are planned. This Scope is Lot 3.
Vergabe-Status
- Vergabe-Status
- Vergabeergebnis liegt uns nicht vor