Mehr Details
Qualification system for electrotechnical works services in 220/380 kV substations with tenders/ RFQs and execution in English language
50Hertz Transmission GmbH · Berlin · Berlin
Angebotsfrist abgelaufen — eine mögliche Verlängerung im Original-Portal prüfen →Diese Frist ist vorbei — die nächste muss es nicht sein.
Wer 50Hertz Transmission GmbH beobachtet, bekommt neue Ausschreibungen dieser Vergabestelle per E-Mail — am Tag der Veröffentlichung statt Wochen später über eine Suchmaschine.
Kostenlos beobachten →Beschreibung
The following work in the grid area of 50Hertz Transmission GmbH and affiliated companies is to be awarded via the qualification system: - Electrotechnical planning services - Material deliveries - Installations and assembly - Commissioning - Dismantling and disposal services Construction services and delivery of large components are provided. Voltage level from 0.4 kV and up to 380 kV. Installation services includes, amongst others: - Switchgear / bay (line, transformer, choke, coupling, etc.) - Coupling - Earthing system, lightning protection - Auxiliary systems (0.4 kV system, DC voltage system, locking and access system, system and orientation lighting, installation of relay houses) - Secondary technology (protection technology, control technology, fiber optic infrastructure, communications technology, metering)
Änderungen am Verfahren
1 AktualisierungDer Auftraggeber hat dieses Verfahren nach der Veröffentlichung angepasst.
-
✏️ Änderung
Ergänzende Informationen
Maßgeblich ist stets die Original-Bekanntmachung beim Auftraggeber. Vollständiger Verfahrensverlauf →
KI-Eignungsanalyse
KI-generiertBranche: Bauwesen & Infrastruktur
Das Wichtigste auf einen Blick
- Qualifizierungssystem für elektrotechnische Arbeiten in Umspannwerken bis 380 kV.
- Leistungsumfang beinhaltet Planung, Lieferung, Installation, Inbetriebnahme, Demontage und Entsorgung.
- Die Arbeiten umfassen Schaltanlagen, Erdungssysteme, Hilfssysteme und Sekundärtechnik.
- Die Ausschreibung und Ausführung erfolgen in englischer Sprache.
- Erfahrung in der Durchführung komplexer elektrotechnischer Projekte ist erforderlich.
Es wird ein Qualifizierungssystem für elektrotechnische Arbeiten in Umspannwerken von 0,4 kV bis 380 kV eingerichtet.
Hinweis nach EU AI Act Art. 50: automatisiert erstellt (Google Gemini) — ersetzt keine Prüfung der Original-Vergabeunterlagen. Mehr ▾
Diese Kurzanalyse ist ausschließlich ein Hilfsmittel zur schnellen Orientierung und keine Eignungs- oder Rechtsberatung. Die verbindlichen Angaben entnehmen Sie bitte der Original-Bekanntmachung (oeffentlichevergabe.de). Details zu unserer KI-Nutzung: KI-Transparenz.
🎯 Persönlicher Treffer-Check
Wie viele Bauwesen & Infrastruktur-Ausschreibungen in Berlin passen zu Ihrem Unternehmen?
30 Sekunden, keine Anmeldung — wir zeigen Ihnen live, wie viele relevante Vergaben es zuletzt gab.
Passende Ausschreibungen in „Bauwesen & Infrastruktur" automatisch erhalten
14 Tage voller Zugang gratis — tägliche Alerts + KI-Eignungsanalyse · keine Kreditkarte · danach kostenfrei weiter
Zuschlagskriterien
Wonach der Auftraggeber das wirtschaftlichste Angebot ermittelt.
-
Award criterion - Price nach WichtigkeitPreis
Price is not the only award criterion. The award criteria and evaluation mechanism are specified for each individual tender (under the qualification system) separately.
-
Award criterion - Quality nach WichtigkeitQualität
Quality is not the only award criterion. The award criteria and evaluation mechanism are specified for each individual tender (under the qualification system) separately.
Quelle: Bekanntmachung (eForms) — Gewichtung wie vom Auftraggeber veröffentlicht.
Anforderungen an Bieter (Eignung)
Was Sie zur Teilnahme nachweisen müssen — wie vom Auftraggeber gefordert.
Wirtschaftliche & finanzielle Leistungsfähigkeit
-
Wirtschaftliche/finanzielle Leistungsfähigkeit
For information purposes, you can find an informative overview uploaded on sharepoint (see section communication, “_Information-Sheet-Overview_PreQuali_Substation_ELT_EN”). You will be required to respond to each qualification criteria listed below after you are invited to the Ariba event. +++ Requirements that the participants must fulfill regarding their qualifications: a) There are no grounds for exclusion pursuant to Sections 123, 124 GWB b) Compliance with the statutory minimum wage or the collectively agreed remuneration regulations c) Signature of the declaration of commitment "Sanctions against Russia" and compliance with its content +++ Methods by which the fulfillment of the individual requirements is checked: a), b): Self-declaration: Applicant questionnaire and approval (check mark) in the Ariba portal c) Self-declaration and proof: Applicant questionnaire and upload in the Ariba portal
Quelle: Bekanntmachung (eForms). Maßgeblich sind die vollständigen Vergabeunterlagen.
Erfüllen Sie diese Anforderungen?
Diese Ausschreibung verlangt Nachweise zu Wirtschaftliche & finanzielle Leistungsfähigkeit. Mit einem kostenlosen Firmenprofil gleichen wir die veröffentlichten Anforderungen automatisch mit Ihrem Profil ab — bei jeder Ausschreibung mit strukturierten Eignungskriterien. 14 Tage voller Zugang, keine Kreditkarte.
Mit der Anmeldung akzeptieren Sie unsere AGB und bestätigen, die Datenschutzerklärung zur Kenntnis genommen zu haben. AusschreibungsRadar richtet sich ausschließlich an Unternehmer im Sinne von § 14 BGB.
Vergabe- & Vertragsbedingungen
Wichtige Bedingungen für Angebot und Ausführung — wie vom Auftraggeber bekannt gemacht.
-
Nachforderung fehlender Unterlagen möglich
Der Auftraggeber darf fehlende, unvollständige oder fehlerhafte Unterlagen nachfordern (§ 56 VgV).
- Elektronische Rechnung (eRechnung) verpflichtend
-
Besondere Bedingungen für die Auftragsausführung
Der Auftrag ist an zusätzliche Ausführungsbedingungen geknüpft (§ 128 GWB) — Details in den Vergabeunterlagen.
Hinweise zur Nachprüfung & Rügepflicht
Precise information on the deadlines for appeals: Time limits for filing an application for review are set out in Section 160 (3) GWB. For clarification, this provision is reproduced in full. "The application is inadmissible, if 1. the applicant has recognized the alleged violation of procurement regulations before submitting the application for review and has not notified the contracting authority within a period of ten calendar days; the expiry of the period pursuant to Section 134 (2) GWB remains unaffected, 2. violations of procurement regulations which are recognizable on the basis of the notice are not notified to the contracting authority by the expiry of the period for application or submission of tenders specified in the notice at the latest, 3. violations of procurement regulations that are only recognizable in the tender documents are not notified to the contracting authority by the expiry of the deadline for application or submission of tenders at the latest, 4. more than 15 calendar days have passed since receipt of the notification from the contracting authority that it does not intend to remedy a complaint."
Quelle: Bekanntmachung (eForms). Maßgeblich sind die vollständigen Vergabeunterlagen.
Verfahrensverlauf
📅 .icsVollständige Historie dieses Vergabeverfahrens — alle Phasen und Veröffentlichungen.
-
Ausschreibung Sie sind hier
Angebote werden eingeholt
2 Veröffentlichungen
- Frist 18.07.2026 Ergänzende Informationen · in TED EU + oev aktuell
- 30.08.2024 Original-Veröffentlichung · in TED EU + oev
-
Wertung
Angebote werden geprüft
-
Vergabeergebnis
Vergabeergebnis liegt uns nicht vor — beim Auftraggeber direkt erfragen
Preiseinschätzung
Basierend auf 1.061 vergleichbaren Vergabeergebnissen:
Statistische Auswertung öffentlicher Zuschlagswerte. Keine Preisempfehlung.
Ähnliche Ausschreibungen
📬
Passende Ausschreibungen automatisch finden
14 Tage volle KI-Analyse + tägliche Alerts gratis testen — keine Kreditkarte, danach kostenfrei weiter.
💡 Mehr als wöchentlich? Watchlist ab 9 €/Mo: täglich + Frist-Reminder + Zuschlag-Info →
Personalisiertes Suchprofil einrichten → · Für Einkaufsabteilungen: Rechnung per Überweisung →