AusschreibungsRadar — Verfahrensauszug

Quelle: oeffentlichevergabe.de (https://ausschreibungen.giz.de/Satellite/notice/CXTRYY6YTTY3D4ZM/documents) · Abgerufen am 10.09.2026 21:46 über https://ausschreibungsradar.com/ausschreibung/ted-544688-2026/

10015490-Development of a green corridor project and street design training in Dakar

Notice-ID: ted-544688-2026 · Procedure-ID: a71a2e2f-c1d4-4fa3-baaa-fbda99e1b589

Zurück zur Vergabe

Stammdaten

Auftraggeber
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, Eschborn
Veröffentlicht
21.07.2026
Frist (Submission)
28.08.2026
Notice-Typ
Ausschreibung
Verfahrensart
Offenes Verfahren
CPV-Code
90712000 — Abwasser, Abfall und Umwelt
Branche
Energie & Umwelt
Rechtsgrundlage
EU-Oberschwelle
KMU-geeignet
Ja (laut Auftraggeber-Angabe)
Grüne Beschaffung
Ja

Beschreibung

Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months.

Vertragslaufzeit

Periode
12 Monate
Verlängerungsoption
bis zu 2× verlängerbar

Verfahrens-Bedingungen

Bindefrist
124 Tage

Vergabe-Status

Vergabe-Status
Vergabeergebnis liegt uns nicht vor

Verfahrensverlauf — alle 3 Veröffentlichungen

Zuständige Vergabekammer (laut Bekanntmachung)

Vergabekammern des Bundes, Bonn

Angabe aus der TED-Bekanntmachung. Im Streitfall ist die tatsächlich zuständige Vergabekammer nach §§ 155 ff. GWB maßgeblich, nicht zwingend die hier genannte.

Hinweis zur Verwendung: Dieser Auszug fasst die zum Erstellungszeitpunkt verfügbaren Daten zur Vergabe zusammen. Quelle der Daten ist oeffentlichevergabe.de (Beschaffungsamt des BMI), vermittelt durch AusschreibungsRadar. Der Auszug ist eine unverbindliche Aufbereitung öffentlich zugänglicher Bekanntmachungen und keine Urkunde im Sinne der ZPO. Für rechtsverbindliche Zwecke ist immer die Original-Bekanntmachung unter dem oben angegebenen Permalink heranzuziehen. Daten können sich nach dem Erstellungszeitpunkt geändert haben (Folgeversionen, Stornierungen, Korrekturen).