AusschreibungsRadar — Verfahrensauszug
Environmental monitoring during construction phase for OWP EnBW He Dreiht and monitoring during operational phase for OWP EnBW He Dreiht
Stammdaten
- Auftraggeber
- EnBW He Dreiht GmbH & Co. KG
- Veröffentlicht
- 30.10.2023
- Notice-Typ
- Vergabeergebnis
- Verfahrensart
- Verhandlungsverfahren mit Teilnahmewettbewerb
- CPV-Code
- 90000000 — Abwasser, Abfall und Umwelt
- Branche
- Energie & Umwelt
- Rechtsgrundlage
- EU-Sektorenrichtlinie
Beschreibung
Environmental surveys according to the standard "Investigation of the impacts of offshore wind turbines on the marine environment (StUK4)" of the protected goods avifauna and marine mammals during the construction and installation phase. — Environmental surveys according to the standard "Investigation of the impacts of offshore wind turbines on the marine environment (StUK4)" of the protected goods avifauna and marine mammals during the operational phase. — Environmental surveys according to the standard "Investigation of the impacts of offshore wind turbines on the marine environment (StUK4)" of the protected goods benthos and fish during the operational phase.
Vertragslaufzeit
- Beginn
- 01.04.2024
- Ende
- 30.11.2025
Vergabe-Status
- Auftragnehmer (2)
- BioConsult SH GmbH & Co. KG · IfAÖ Institut für Angewandte Ökosystemforschung GmbH
Hinweis zur Verwendung: Dieser Auszug fasst die zum Erstellungszeitpunkt verfügbaren Daten zur Vergabe zusammen. Quelle der Daten ist oeffentlichevergabe.de (Beschaffungsamt des BMI), vermittelt durch AusschreibungsRadar. Der Auszug ist eine unverbindliche Aufbereitung öffentlich zugänglicher Bekanntmachungen und keine Urkunde im Sinne der ZPO. Für rechtsverbindliche Zwecke ist immer die Original-Bekanntmachung unter dem oben angegebenen Permalink heranzuziehen. Daten können sich nach dem Erstellungszeitpunkt geändert haben (Folgeversionen, Stornierungen, Korrekturen).