Verhandlungsverfahren mit Teilnahmewettbewerb Vergeben Energie & Umwelt
Mehr Details
Dienstleistungsauftrag EU-Sektorenrichtlinie 2 Lose

Subsea Inspection

EnBW Energie Baden-Württemberg AG · Karlsruhe · Baden-Württemberg

Neue Ausschreibungen in „Energie & Umwelt" — jede Woche per Email

Kostenlos · 1 Email pro Woche · Ein-Klick-Abmeldung · DSGVO-konform

Beschreibung

Lot 1: Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea Lot 1 covers the periodic subsea inspections for the Offshore Wind Farms Baltic 1 (B1) and Baltic 2 (B2). The scope includes visual and functional inspections of underwater support structures of the wind turbine generators (WTG) and offshore substations (OSS). All inspections shall be performed in accordance with the applicable standards of the Bundesamt für Seeschifffahrt und Hydrographie (BSH) and the respective wind farm-specific inspection plans. In B1, all 21 WTGs and the OSS shall be inspected every four years. The next scheduled campaign is planned for 2027. In B2, 20 WTGs shall be inspected annually (25% scope), with both jacket and monopile foundations to be covered. The OSS in B2 is subject to a four-year inspection cycle. The inspections may involve either full visual and functional checks or reduced general visual inspections (GVI). Bidders shall submit fixed lump sum prices for both options. The contractor shall conduct the inspections between April and September. The full organization of the offshore campaign is the contractor’s responsibility, including selection and provision of a suitable DP2 vessel, logistics planning, crew transfers, and inspection equipment such as remotely operated vehicles (ROV). All personnel must hold valid offshore wind certifications and have documented experience in subsea inspections. A logistics concept must be submitted as part of the bid and shall include information on the base port, operational weather limits, contingency planning, and crew transfer processes. Inspection activities must be thoroughly documented. This includes daily reports outlining completed work, deviations, weather conditions, and safety-related events, as well as technical inspection reports. All photo and video recordings must be time- and location-stamped. Final documentation must be submitted no later than six weeks after completion of the offshore works. In addition t

Vollständige Beschreibung (4.213 Zeichen)

Die vollständige Beschreibung ist für registrierte Nutzer verfügbar.

Kostenlos registrieren →

Weitere Pflichtangaben aus der Bekanntmachung

KMU-Anteil der Bieter

10 von 14 Angeboten kamen von kleinen oder mittleren Unternehmen (71 %)

Quelle: eForms-Pflichtangaben der Vergabestelle, erfasst über oeffentlichevergabe.de. Die Angaben werden von der Vergabestelle selbst ausgefüllt — wir prüfen sie nicht auf Richtigkeit.

Zuschlagskriterien

Wonach der Auftraggeber das wirtschaftlichste Angebot ermittelt.

Los 1 · Periodic Subsea Inspections - Offshore Wind Farms in the Baltic Sea
  • Preis 40 %

    Total Cost of Ownership

  • ROV Routine Basic 15 %
    Qualität

    Suitability of proposed methods and tooling to perform scope of work: - General Visual Inspection (GVI) - Close Visual Inspection (CVI) - Ultrasonic Wall Thickness Measurement (UT) - Marine Growth (MG) Measurement - Cathodic Protection (CP) Potential Measurement - Reference-based Measurement of Cable Protection System (CPS) and Scour - MG Cleaning to CSWIP Grade SA 2½

  • Compliance to Contract 10 %
    Qualität

    Contract deviations

  • ROV Specification 10 %
    Qualität

    Suitability of proposed ROV(s): - Appropriate ROV type/classification - ROV weight (kg)/dimensions (m) - ROV thruster speed suitable for currents - ROV justified and demonstrates experience in executing similar work - ROV capable of performing in a variety of environmental conditions - Operational limits are reasonable (e.g. for L&R) - Max ROV payload suitable for carrying required tooling

  • ROV Project Management 10 %
    Qualität

    Review of provided project management qualifications: - Document management system - Monitoring of progress during mobilisation and execution - Post-execution quality and reporting - Strong evidence of experience through submission of supporting documentation (e.g. RAMS or inspection reports) - Suitable management system in place for provision of any critical tooling, equipment and materials - Robust back-office team to support offshore delivery team - Where subcontracted, clear selection process for subcontractors - Where subcontracted, clear management process for subcontractors

  • ROV Routine Enhanced 7,5 %
    Qualität

    Capabilities beyond scheduled works: - Subject Matter Expert (e.g. CP) - Continuous improvement of inspection execution - Additional inspection methods (e.g. 3D anode scanning) - Custom inspection solutions to address unexpected requirements

  • ROV Personnel 7,5 %
    Qualität

    Review of provided personnel qualifications: - Organigrams, CVs and competency matrices for key roles - Verification of personnel information (e.g. required qualifications and training records)

Los 2 · Periodic Subsea Inspections - Offshore Wind Farms in the North Sea
  • Preis 40 %

    Total Cost of Ownership

  • ROV Routine Basic 15 %
    Qualität

    Suitability of proposed methods and tooling to perform scope of work: - General Visual Inspection (GVI) - Close Visual Inspection (CVI) - Ultrasonic Wall Thickness Measurement (UT) - Marine Growth (MG) Measurement - Cathodic Protection (CP) Potential Measurement - Reference-based Measurement of Cable Protection System (CPS) and Scour - MG Cleaning to CSWIP Grade SA 2½

  • Compliance to Contract 10 %
    Qualität

    Contract deviations

  • ROV Specifications 10 %
    Qualität

    Suitability of proposed ROV(s): - Appropriate ROV type/classification - ROV weight (kg)/dimensions (m) - ROV thruster speed suitable for currents - ROV justified and demonstrates experience in executing similar work - ROV capable of performing in a variety of environmental conditions - Operational limits are reasonable (e.g. for L&R) - Max ROV payload suitable for carrying required tooling

  • ROV Project Management 10 %
    Qualität

    Review of provided project management qualifications: - Document management system - Monitoring of progress during mobilisation and execution - Post-execution quality and reporting - Strong evidence of experience through submission of supporting documentation (e.g. RAMS or inspection reports) - Suitable management system in place for provision of any critical tooling, equipment and materials - Robust back-office team to support offshore delivery team - Where subcontracted, clear selection process for subcontractors - Where subcontracted, clear management process for subcontractors

  • ROV Routine Enhanced 7,5 %
    Qualität

    Capabilities beyond scheduled works: - Subject Matter Expert (e.g. CP) - Continuous improvement of inspection execution - Additional inspection methods (e.g. 3D anode scanning) - Custom inspection solutions to address unexpected requirements

  • ROV Personnel 7,5 %
    Qualität

    Review of provided personnel qualifications: - Organigrams, CVs and competency matrices for key roles - Verification of personnel information (e.g. required qualifications and training records)

Quelle: Bekanntmachung (eForms) — Gewichtung wie vom Auftraggeber veröffentlicht.

Vergabe-Ergebnis

🏆 Auftragnehmer RS DIVING Contractor GmbH
💶 Auftragsvolumen (Rahmen) 3.144.937 €
👥 Eingegangene Angebote 14
📅 Zuschlagsdatum 07.04.2026

Bieter-Übersicht: 14 Angebote eingegangen, davon 1 Auftragnehmer namentlich publiziert: RS DIVING Contractor GmbH. Die übrigen 13 Angebote stammen von unterlegenen Bietern — diese werden in deutschen Vergabeergebnissen üblicherweise nicht namentlich genannt.

Verfahrensverlauf

📅 .ics

Vollständige Historie dieses Vergabeverfahrens — alle Phasen und Veröffentlichungen.

  1. Ausschreibung

    Angebote werden eingeholt

  2. Vergabeergebnis Sie sind hier

    Auftrag wurde zugeschlagen

    Auftragnehmer RS DIVING Contractor GmbH

    2 Veröffentlichungen

    Nächste Ausschreibung bei EnBW Energie Baden-Württemberg AG nicht verpassen?

    Auftraggeber-Alert ab 9 €/Mo — tägliche Email sobald etwas ausgeschrieben wird.

    Watchlist buchen →

Preiseinschätzung

Basierend auf 63 vergleichbaren Vergabeergebnissen:

Unteres Quartil 2.254.500 €
Median 3.936.503 €
Oberes Quartil 3.936.503 €

Statistische Auswertung öffentlicher Zuschlagswerte. Keine Preisempfehlung.

Vergabestelle

EnBW Energie Baden-Württemberg AG · Karlsruhe

g.madeddu@enbw.com
000

3.144.937 €
Auftragsvolumen (Rahmen)

Vergabenummer EnBW-2025-0051
Verfahrensart Verhandlungsverfahren mit Teilnahmewettbewerb
Auftragsart Dienstleistungsauftrag
Schwierigkeit Hoch
Standort Karlsruhe, Baden-Württemberg
Veröffentlicht 27.04.2026
CPV-Code 63726620
Logistik und Speditionsdienste (Was ist das?)
Angebote 14
starker Wettbewerb (Ø 3,9 in der Branche) (?)
Lose 2
Laufzeit 01.04.2026 – 31.03.2031
Verlängerungsoption bis zu 3× verlängerbar
Rahmen-Maximum 7.241.036 €

Bieter (1)
RS DIVING Contractor GmbH · Borkum

Auftragnehmer (?)
RS DIVING Contractor GmbH
Vertrag 07.04.2026

Ø Bieter in der Branche 3.9

Historischer Durchschnitt aus 3.728 vergleichbaren Vergaben — keine Prognose für diese Ausschreibung.


Erfasste Abschluss-Meldungen 88%

Anteil der erfassten Verfahren in Energie & Umwelt mit veröffentlichter Zuschlag-Bekanntmachung. Basis: 10.068 Verfahren. Die tatsächliche Zuschlagsquote liegt typischerweise höher, weil viele Vergabestellen Ergebnisse verspätet oder gar nicht melden.


Markt-Insights

Ø Zuschlagsdauer 36 Tage
Schätzwert-Abweichung -6%
KMU-Bieteranteil 39%
Alert für ähnliche Ausschreibungen
CSV Export →
Vergabekammer (laut Bekanntmachung)

Vergabekammer Baden-Württemberg, Karlsruhe

Angabe aus der TED-Bekanntmachung. Im Streitfall ist die tatsächlich zuständige Vergabekammer nach §§ 155 ff. GWB maßgeblich, nicht unbedingt die hier genannte.

Vollständige Daten

Quelle: oeffentlichevergabe.de · 5/5 Kernfelder

Daten korrigieren →